BUT ...
we have the kitchen can set up an extra two weeks before Easter so the smell to escape. In our office was day or night a window on tilt.
Now the kitchen no longer smells unpleasant.
The real problem ....
We have been waiting for about 3/4 weeks in parts, it was missing from the package, a faucet and a hotplate came even damaged at. Meanwhile, the faucet is but arrived a hotplate is still missing.
We have now written down 2x until now was still no answer.
2 points will be deducted, as the kitchen is not always complete.