Large network with warm white lights and long lead

Large network with warm white lights and long lead

Best Season LED lights network, 180 pieces, about 3 x 3 m 498-76 (Garden & Outdoors)

Customer Review

By old broken Christmas lights with small light bulbs, I was forced to look for an alternative for the outdoors. As the old bulbs disproportionate (Increase) draw a lot of power, I have decided for warm white LEDs.
And really, who offered here LEDs hardly consume electricity and give off a yellowish but pleasantly bright light. I have so hung a very high cherry laurel and can now leave the walkway lighting.
The size of the network is more than useful and the long lead (estimated 6-8m) makes the installation of an extension cord - in my case - unnecessarily.
I would buy the fairy lights at once and can not, given the natural, warm light fully recommend!

Short and sweet - a dream! Rank: 5/5
March 2
64GB Micro SD 1 Rank: 5/5
June 1
Practice, to take everywhere! Rank: 4/5
February 1
1 battery CANON Rank: 2/5
January 14
not very top 1 Rank: 1/5
March 29
All around great! Rank: 5/5
February 23

Related Reviews


Rugged Camping lamp with LED cold light and long battery lifeLiteXpress Camp 200 green / black, camping lantern, 3 high-power LEDs up to 230 Lumen, plastic housing, power rating according to ANSI standard (tool) Too cold for warm white light, and light for 1W10X MENGS® E14 LED bulb lamps & bulb 1W (100LM - Warm white 3500K - 120 ° viewing angle - AC 220V - 7x5050 SMD LEDs - Ø15 × 48mm) energy-saving light Not a nice warm white lightE14 3W LED lamp sebson - cf. 25W bulb - 240 Lumen - E14 LED warm white - LED lamps 160 ° (household goods) beautiful warm white lightEnergmix E14 LED bedroom with 5 Watt Warm White LED bulb Lamp bulb candle light for living room children's room and refrigerator and cooker hood 5w 230V, 2488 W (household goods) Very nice, bright and warm white light ...LED light chain 160 LEDs POWER 12,7m - (365 017) Finally a really 40W replaced and warm white lightsSEBSON® G9 LED lamp 4W Matt - cf. 40W bulb - 360 lumens - G9 LED warm white - LED lamps 160 ° Cheap LED lights with angemehm warm white lightLED light chain 20 bulbs 1a warm white transparent cable battery long burn time Dimmable and really "warm white" lightLED lamp LED bulb 6 Watt 827 E27 dimmable warm tone extra (Electronics) good lights network, but warm white?Konstsmide 3749-100 LED lights network 64 warm white diodes / 2x2 meters / 24V external transformer / black cable (household goods) very bright warm white light (replaces 35W lt. packaging)SEBSON® 4-pack E14 6W LED reflector lamp R50 - cf. 40W bulb - 400 Lumen - E14 LED warm white - LED lamps 160 ° Very good workmanship, but not really "warm white" lightKRINNER 74222 LUMIX CLASSIC Basic Set ivory IR, 10 ivory, wireless LED Christmas tree lights with infrared remote control and batteries in warm-white light (household goods) Pleasant (warm white) lightLE 3W G9 LED lamps replace 20W halogen lamps, 240lm, warm white, 2700K, 160 ° viewing angle, LED bulbs, LED lamps, 5-pack Nix with warm white!Lighting Ever® 7 Watt A60 LED bulb, E27 base, global beam angle, replaces 40W incandescent lamp, warm white (household goods) First LED lamp that delivers what it promises - really "warm white" light + DimmablePhilips LED lamp replaces 60Watt E27 2700 Kelvin - warm white, 5,7Watt, 345 lumens (household goods) Heitronic LED light chain for outdoor IP44 30 LED, warm white, light length: 3m ...Heitronic LED light chain for outdoor IP44 30 LED Warm white light Length: 3m (3m 30 LED) (Electronics) Bright light with warm color, dimmable and well adaptable48 LED White Desk Lamp (5W, warm white, dimmable, adjustable) Great warm white light with incredible light output with less than 4 wattsSebson E14 LED lamp 4W Matt - cf. 40W bulb - 360 Lumen - E14 LED warm white - LED lamps 160 ° (household goods) Shapely, handy and with Warm WhiteO9-TECH New Design LED Touch Desk Lamp, eye protection desk lamp, Versatile daylight LED lights, angle-adjustable, warm lighting and cold switch freely, brightness adjustment, touch-panel multi-level brightness control, one minute delay from, 5V / 1A USB Charging Port simple, functional and space saving, this pleasantly warm, dimmable light and great for just four watts light output48 LED White Desk Lamp (5W, warm white, dimmable, adjustable)