For the price, the patch panel is fine. Indirect mounting by pushing to not quite sunk screw heads turned at my application is the main problem. Therefore, have 2 through holes drilled at appropriate locations and the part properly bolted to the carrier. The force clamped by the infected or Cables exerted, is generally used for a easy connection to the ground too big.