Already much to me it must be built very solid when unpacking, since it was pretty hard but. I was not disappointed. The pull rod is made of stainless steel, the housing for the wall mounting of a complete metal part, therefore very robust and solid.
The attachment (see below for more) went to the wall (almost) without any problems, I had to after marking the first anchor notice that he was not quite up to the tile Ran (see picture). This therefore was the last piece on the anchor so has type fins, which enter into normal course plaster, with flow but forwards pushed back. I at the next then these fins cut with NEM Cuttermeser.
You have to mark the holes precisely and drilling, because not a lot of room is to move the fixture.
The enclosed screws are thick and long enough the whole thing sure to keep what one yes from DIY products can not always claim.
The dowels are original fishermen how to use them also in the profession Ionelen craft, and not as a billigs *****
The Final Fix the rod is not a major problem, and once the grub screw is tightened holds everything Bombenfest even a sodden towel including full draw the holder can not harm.
I am very impressed with this towel rail and there are companies who pay attention to quality and made a head over the developed product.
The drilling holes in tiles:
I've penciled me the holes with a pencil / Edding.
Then a piece of tape over the holes pasted. has 2 effects:
1. the drill does not slip on the smooth flow from
2. It prevents Something abschplittert
As 1. I with a 5 iron drill only the leveling including glaze drilled, has the advantage of the iron drills are very sharp and therefore well cut into the glaze, thereby maintaining the speed (no impact) very low. Of course you can drill the holes in the 3-4 tonne Kloppen because it's pretty dull.
CAUTION: Before Ansetzten to the hole with water cool nights, otherwise it will melt and the scotch talking about the flow scrapes.
as 2. I then with a 5 Series masonry drill without impact and low speed pierced the leveling.
As a final step I then the holes using a masonry drill bit 6 drilled, the leveling again without impact and low speed, then beat and then with a higher speed in the masonry, so deep does this fit the dowel. But be careful here, too, the angle should be changed too much while drilling, ie the inclined Maschiene are held, there is a risk that the edge of the borehole spalling something glaze.
For any damages I am not responsible;)
Positives:
Processes + Clean
+ Uncomplicated On / cultivation
+ Enclosed Befestigungsmateriel is absolutely great and sufficient
+ Stable enough for wet towels
Negatives:
- Is nothing noticed
This article gets me 5 of 5 stars
UPDATE:
Since the towel rail is used daily, ie remove the towel and replace it again, I now had both the grub screw holding the rod, tighten. The rod was loose and wobbled.
You just have to be careful that you do not overtighten "slamming", because we know that coming to firmly ... from. thus you can easily damage the threads and screw holds may no longer.
Otherwise, there is still nothing to complain about. I iimmernoch joy of my towel as a beautiful towel rail are increasing.