Conclusion after 2 deliveries: It lacks essential parts of the equipment, so including the glands. Drilling of items of frame does not fit in line ,. These must be reamed or filing down. The stability is questioned. The best items to order 3 x and then cobble together an article from it, and return the rest. Spare parts can be ordered through ISC principle. But as well in all the boxes at each saw parts are missing, for example, the fittings are currently not available. Subsequent delivery can take 1-2 months. To Saw: This runs at extremely slow, until it reaches the speed, so that one can work. So a quick work impossible. The included blade is only good for rough woodwork. Paneling or plywood FAZZT from (very untidy cut). Here a better blade must be used. Screws on the machine are rusted, the paint of the machine damaged. Attachments made of plastic, which can not expect a long service life. Insgesamtes judgment: flunked Article