Today, the box was mounted in a cistern for the top anhydrous area. In short, they met all my expectations! The design of the seal, the design centering the clamping block and the highlighting of SL introduction are well managed. The installation was completed smoothly. For me one little downer: I would have expected at the terminal block located under the screw a metal strip.