I ordered this cable to every room to provide with speaker cables. Had tuned the substructure of the kitchen. Cable laid and about every meter was a piece of sheathing defective.
Again rolled together and now it's back.
Have during construction do better to control than cable.
If my review have been helpful so I ask you question the: