Otherwise I can not understand the reviews regarding the assembly instructions ... because I got garkeine delivered.
But with a little common sense I've built the dresser in 2 hours, so maybe leave from the front into the guide, in which what I read here.
The result is impressive, except that in the changing mat wood screwing together something is chipped, but you can live with the price. And it is also big enough!
My full purchase recommendation!
-------------------------------------------------- --------
Finally my recommended order to build:
- First, the drawers: front screws on the side boards, floor clean and the rear part screw, handles off and ... the 3 smallest boards that are in the boxes are for the median strip of the drawer
- Now the drawer rails on the side boards screws (slightly fiddly job to the rails and with me the foremost hole was drilled wrong)
- Building the Frame: The frame with the groove best first (do not forget the wall!), Then attach the side boards because then the front frame and fasten the remaining scaffolding
Important: The pages or boards with the holes on the side get to the top, set screws and wooden dowels with mind.
- Push the side walls of the top of the scaffold
- Screw the winding walls of the cover board
- Fasten the lid board on the scaffolding
- The drawer on the rails attach (best start with the bottom, then the front frame serves as a support when clean screws and then the underlying drawers)
- Finish