But the story does not Ende.Von reviews I read out that the screws were allegedly insufficient. In the time when the second shower on the way was, I got in a lot of OBI washers (the present were not supplied / are) and longer screws incl. Steel dowels. These were screwed into a concrete foundation and it took very long to realize that the shower can not possibly stand up straight. The Problem. the base and the body of the shower is not an element but only plugged into each other. This means that the shower did not "bomb fixed" in the version available but yields in wind or when lean against. With many hours of work and washers, we were able to fix the shower anyway.
Now to the shower experience: GORGEOUS !! It is crucial to find a good place for the shower, which means a full-time non-stop Sonneneintrahlung. Then the water is up to 40/45 degrees Celsius (60 degrees is utopia ..) With the mixer can cause cool water and you get a pleasant desire temperature. By the way, we have the hose buried 20 cm that the water in the hose is not hot and they burn up :)
Conclusion: A really great product, which in terms of quality unique to the private garden available. It takes a decent concrete foundation which the shower, which so weighs just around 50 kilos can wear (incl. Water). Who really has no manual skills is better to keep your hands of it, for concreting, screws and designing needs a lot of time and patience.
And by the way: You should think what to do with the shower in the winter. Only leave the water and invert a plastic bag over it's no solution. We have considered too late. Because Unscrew is not an option or not going :(
Appeal to Bergland-Handels-GmbH: separates you from DPD as a supplier !!
I hope I could help you :))
Philipp