The rack ansich is built right fix, all necessary screws are included. Annoying a bit which was a little bent sheet that on some edges already, but that was quickly addressed exercising with little pressure. But that's about the flaw, because really thick sheet is not really. Until the cabinet is fully assembled, it is nevertheless a shaky history. In the end it's like with every cabinet - as soon as the rear wall is off, everything is ok. The cable entry is done from above or below by outside forces the plates dance on the floor or cover. The wall mounting appears promising. The manual consists of a badly copied A4 page, where the bottom line (8 photos and brief concise English instructions) missing. But nothing daramatisches.
Tip: If you like I want to incorporate its switch and patch panel here should leave plenty of room in front, so that the door still approaching. In Manual is provided that you are the vertical bars that take up the 10 inch thread and thus devices screwed to vorderstmöglicher position. If you do that and installs after calming hour build patch panel and switch, you will notice that one (I assume that with 25cm length) approaching the door nichz more because of the patch cable. So, the vertical bars installed a bit later, I recommend 10cm backwards.
As a patch panel and shelves I use the black from Digitus. When the Switch Gigabit Switch Zyxel.